Left Spacer
Spacer
spacer Click here for Text Only Version Separator Office of the Prime Minister Spacer
Grey Line
Spacer
Spacer
Spacer

Planning and Priorities Coordination Department

 
Coat of Arms of Malta
 

Office of the Prime Minister

Spacer
Spacer
Menu Separator Left About PPCD Spacer Cohesion Policy 2004-2006 Spacer Cohesion Policy 2007-2013 Spacer Pre-Accession/TF/TAIEX Spacer Other Funding Programmes Spacer General Menu Separator Right
Light Grey Line
Spacer
Spacer
Spacer
spacer
spacer
Home : Structural Funds and the Cohesion Fund 2007-2013 : Operational Programme I : Priority Axis 4 - Mitigation and Adaptation to Climate Change

Priority Axis 4 - Mitigation and Adaptation to Climate Change

Operational Programme I - Priority Axis 4 aims to implement measures that are intended to mitigate the risks brought about by climate change and also measures intended to reduce aerial emissions resulting from electricity generation which, is one of the greastest sources of greenhouse emissions. 

The financial allocation for this Priority Axis amounts to €121,000,000 of which €102,850,000 are Community Funding (European Regional Development Fund).


Operational Objectives

This Priority Axis aims to reach a number of operational objectives:

  1. To reduce airborne emissions resulting from electricity generation;
  2. To study the viability of interconnection with mainland Europe and other means to secure supply (through, for example, large offshore RES farms), including the expansion of the current distribution system to cater for increased electricity generation;
  3. To promote the use of RES and energy efficiency and reduction in the use of non-renewable energy sources;
  4. To promote the use of RES and energy efficiency measures at the domestic and enterprise levels;
  5. To develop infrastructure to minimise the effects of storm water.


Focus Areas of Intervention

The focus areas of intervention identified by this Priority Axis are:

  • Energy
  • Flood Relief


Major Projects

  • Reduction of Emissions from the Delimara Power Station
  • National Flood Relief Programme


Further Information:

  • Main page on Operational Programme I.
  • Download Operational Programme I for further detail. Information on the Priority Axes can be found in Chapter IV of OPI.


 

Spacer
spacer
Left Spacer